At this point, all work within the salon was finally finished and the salon was fully operational.

The final touches that took place since the last phase included:

  • Touching up and sealing the floor
  • Addition of millwork doors and drawers
  • Salon signs and logos
  • Arrival and installation of spa bath equipment
  • Final paint and finish touch-ups
  • Additional lighting installed